USNS POINT LOMA (T-EPF 15) Mid-Term Availability

Department of DefenseMSC WAREHOUSE

AI Overview

Seeks a contractor to prepare for and carry out the Mid-Term Availability maintenance overhaul of the USNS Point Loma, a Navy expeditionary fast transport ship. This is a standard ship maintenance and availability effort rather than a new technology development opportunity.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 15, 2026
Due Date
October 20, 2026

Official Description

--- Attachment text --- [N3220526R6128___Amendment_0005.pdf] R 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment...

View on official source

Change History

Description ChangedOct 19, 2026 at 6:46 PM

Critical change · Deadline + Requirements + Description

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

The description change is mainly an amendment update. Previously the attachment was Amendment 0004; it is now Amendment 0005.

  • Response deadline moved: Amendment 0005 extends the solicitation closing date to October 27, 2026 at 1:00 PM EDT (from October 20, 2026 at 3:00 PM). Offers must acknowledge the amendment before the closing time, or they risk rejection.
  • Scope and requirements: The notice text itself is unchanged in substance. It still covers preparing for and accomplishing the Mid-Term Availability for the USNS Point Loma (T-EPF 15) per the work item package.
  • Why it matters: Applicants gain one additional week to prepare and submit, and must reference the amendment number in their acknowledgment.
Description ChangedOct 13, 2026 at 5:40 PM

Material change · Requirements + Scope + Description

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

  • Amendment 0004 added to the attachments. The description now includes SF-30 amendment text for solicitation N3220526R6128, which states the solicitation is amended per Item 14, but the visible excerpt does not say whether the offer due date was extended or left unchanged. Applicants should check Item 14 of the amendment for the actual scope change.

  • New RFC batch (059–065) answered. Clarifications cover:

    • Work item 1003: flight deck door frame prep to SSPC-SP 11, with spot work acceptable if it brings doors to good condition.
    • Work item 0108: bilge pumproom coating is largely wash and touch-up, depending on the paint representative on site.
    • Work item 0160: all outboard watertight doors to be removed, disassembled, inspected, and overhauled, with adjacent coating feathering depending on contractor care.
    • Work item 0512: stern ramp SSPC-10 prep, with UHP waterblasting possible if MSCREP approves; the contractor assumes risk of water on aluminum.
    • Work item 801A: specific solvent cleaning and non-metallic abrasive prep for HVAC areas, prohibiting carbon steel, iron, and copper tools.
  • New RFC batch (066–068) on work item 0499 (E-Console). Austal initially declined to bid, citing capacity and flow-down terms. The answer now confirms Austal will bid on WI 0499, which matters for teaming and sourcing decisions.

Description ChangedOct 4, 2026 at 3:38 PM

Informational change · Description

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

Key Changes to N3220526R6128 Amendment 0002

The description now includes 16 additional Requests for Clarification (RFCs 038-052) addressing specific work scope questions:

Major Clarifications:

  • WI 513 (Sewage/Macerator Pump): Contractors must bid scope as written; OEM exceptions handled on-site
  • WI 120 (Aluminum Repairs): Clarified furnished plate quantities (4 sheets of 6mm 5083, 8 sheets of 8mm 5083, 4 sheets of 6mm 6061); crack repairs may involve dissimilar aluminum grades (5xxx/6xxx/5454) with varying thicknesses
  • WI 160 (Watertight Closures): Reference drawing shows 76 openings (not 69); overlaps with WI 1003
  • WI 201 (Plate Cooler): SmartPAC coolers must be cleaned; in-place fittings allow optional disassembly per Port Engineer discretion
  • WI 173A (Preserve and Paint Topside): Use version dated 2026-09-12 from MSC contracting
  • Cast Aluminum/Duplex Steel: No projected repairs; changes via future contract modification if needed
  • Staging Requirements: Minimal 4-meter staging needed; refer to HSSD document for specific locations

Impact: Contractors must bid full scope uncertainty on material grades, thicknesses, and inspection-dependent staging rather than exact specifications.

Description ChangedSep 24, 2026 at 5:46 PM

Informational change · Description

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

Description information changed.

Description ChangedSep 22, 2026 at 6:04 PM

Material change · Requirements + Scope + Description

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

Multiple Request for Clarification responses added critical technical specifications, work item clarifications, and contract details (AGR/ODC costs, shore power duration, equipment serials, work item scope) that materially affect bidding and performance requirements.

Opportunity AddedSep 21, 2026 at 11:23 PM

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

New opportunity: USNS POINT LOMA (T-EPF 15) Mid-Term Availability

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.

Start Free Trial