Child Development Center (CDC), Tinker Air Force Base, Oklahoma
AI Overview
Seeks a contractor to build a new Child Development Center at Tinker Air Force Base, Oklahoma, with updated foundation drawings, environmental assessment, and asbestos/lead survey documents. This is a standard construction project for military childcare facilities.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Solicitation_Amendment_0002__W912BV26RA016.pdf] 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the ame...
Change History
Critical change · Deadline + Scope + Requirements + Attachment + Description
Child Development Center (CDC), Tinker Air Force Base, Oklahoma
- Proposal due date extended: from 30 October 2026 (3:00 PM CT) to 13 November 2026 (3:00 PM CT), per the Block 14 summary and the Section 00 00 00 response-date table.
- Period of performance lengthened: construction completion time in Section 00 73 00 raised from 732 to 1,062 calendar days, so bidders must reflect the longer schedule in pricing and staffing plans.
- New FAR provisions and clauses added: 52.223-1 (Biobased Product Certification), 52.223-4 (Recovered Material Certification), 52.223-2 (Reporting of Biobased Products), and 52.223-9 (Estimate of Recovered Material Content), requiring certifications and reporting.
- AI statement added to Section 00 73 00 and a revised Quality Control Manager qualifications section (01 45 00, page 8).
- Evaluation criteria and CLIN pricing schedule notes updated (Sections 00 22 16 and 00 10 00), which affects how offers are scored and priced.
- New reference reports added: a 24-page Pre-Demolition Asbestos and Lead-Containing Paint Survey for the utility tunnel, and an 80-page Final Environmental Assessment for the new Child Development Center.
- Drawing sheets revised: foundation plans and sections (S-100 through S-104, S-501, S-503, S-504) and signage and room schedules (IG601, IN601), all dated 10-06-2026.
- Transition notice: USACE is moving from RMS to the Construction Management Platform during contract performance; contractors remain responsible for existing reporting and submittal requirements.
Why it matters: applicants need more time to plan, must price a longer schedule, must address new environmental and sustainability certifications, and should review the revised drawings and reports before submitting.
Informational change · Description
Child Development Center (CDC), Tinker Air Force Base, Oklahoma
Description information changed.
Material change · Description + Attachment + Requirements
Child Development Center (CDC), Tinker Air Force Base, Oklahoma
The opportunity description was replaced with solicitation form content and an attached PDF document, significantly changing the presentation of submission requirements and contract terms.
Child Development Center (CDC), Tinker Air Force Base, Oklahoma
New opportunity: Child Development Center (CDC), Tinker Air Force Base, Oklahoma
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.
Start Free Trial